Difference between revisions of "Development costs"

From YIMBYwiki
Jump to: navigation, search
Line 23: Line 23:
  
 
== Taxes and fees<br/> <br/> &nbsp; ==
 
== Taxes and fees<br/> <br/> &nbsp; ==
 +
  
  
Line 31: Line 32:
 
**"Housing delayed is&nbsp;housing denied (and rent increased)." Sightline, August 10, 2017.&nbsp;[http://www.sightline.org/2017/08/10/housing-delayed-is-housing-denied/ http://www.sightline.org/2017/08/10/housing-delayed-is-housing-denied/].<br/> &nbsp;  
 
**"Housing delayed is&nbsp;housing denied (and rent increased)." Sightline, August 10, 2017.&nbsp;[http://www.sightline.org/2017/08/10/housing-delayed-is-housing-denied/ http://www.sightline.org/2017/08/10/housing-delayed-is-housing-denied/].<br/> &nbsp;  
  
 +
 +
&nbsp;
  
 
*California Department of Housing and Community Development. 2014 California Affordable Housing Cost Study, October 2014. [http://www.treasurer.ca.gov/ctcac/affordable_housing.pdf http://www.treasurer.ca.gov/ctcac/affordable_housing.pdf].<br/> &nbsp;  
 
*California Department of Housing and Community Development. 2014 California Affordable Housing Cost Study, October 2014. [http://www.treasurer.ca.gov/ctcac/affordable_housing.pdf http://www.treasurer.ca.gov/ctcac/affordable_housing.pdf].<br/> &nbsp;  
Line 39: Line 42:
 
*LePatner, Barry B. ''Broken Buildings, Busted Budgets: How to Fix America's Trillion-Dollar Construction Industry.''&nbsp;October 15, 2007. [https://www.amazon.com/Broken-Buildings-Busted-Budgets-Trillion-Dollar/dp/0226472698 https://www.amazon.com/Broken-Buildings-Busted-Budgets-Trillion-Dollar/dp/0226472698].<br/> &nbsp;  
 
*LePatner, Barry B. ''Broken Buildings, Busted Budgets: How to Fix America's Trillion-Dollar Construction Industry.''&nbsp;October 15, 2007. [https://www.amazon.com/Broken-Buildings-Busted-Budgets-Trillion-Dollar/dp/0226472698 https://www.amazon.com/Broken-Buildings-Busted-Budgets-Trillion-Dollar/dp/0226472698].<br/> &nbsp;  
 
*McKinsey Global Institute. "Reinventing construction through a productivity revolution." February 2017.&nbsp;[http://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/reinventing-construction-through-a-productivity-revolution [1]].&nbsp;<br/> By Filipe Barbosa, Jonathan Woetzel, Jan Mischke, Maria Joao Ribeirinho, Mukund Sridhar, Matthew Parsons, Nick Bertram, and Stephanie Brown.<br/> &nbsp;  
 
*McKinsey Global Institute. "Reinventing construction through a productivity revolution." February 2017.&nbsp;[http://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/reinventing-construction-through-a-productivity-revolution [1]].&nbsp;<br/> By Filipe Barbosa, Jonathan Woetzel, Jan Mischke, Maria Joao Ribeirinho, Mukund Sridhar, Matthew Parsons, Nick Bertram, and Stephanie Brown.<br/> &nbsp;  
*Meyer Trust (Portland, Oregon). "[https://mmt.org/sites/default/files/inline-files/Cost-Efficiencies10_1_15.pdf The Cost of Affordable Housing Development in Oregon: Meyer Memorial Trust Cost Efficiencies Work Group Final Report.]” October 2015. https://mmt.org/sites/default/files/inline-files/Cost-Efficiencies10_1_15.pdf.
+
*Meyer Trust (Portland, Oregon). "[https://mmt.org/sites/default/files/inline-files/Cost-Efficiencies10_1_15.pdf The Cost of Affordable Housing Development in Oregon: Meyer Memorial Trust Cost Efficiencies Work Group Final Report.]” October 2015. [https://mmt.org/sites/default/files/inline-files/Cost-Efficiencies10_1_15.pdf https://mmt.org/sites/default/files/inline-files/Cost-Efficiencies10_1_15.pdf].<br/> &nbsp;  
*
+
Rider Levett Bucknall Ltd. (Phoenix, Arizona, USA). "Rider's Digest 2016." http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf.
+
 
+
"A &nbsp;compendium of USA cost data and related information as well as international cost data.&nbsp;<br/> Rider Levett Bucknall is an international property and construction consultancy firm with over 120 offices worldwide.&nbsp;The costs stated in this section represent hard construction costs and reflect the standards and specifications normal to that country or region. Variation in costs may be experienced for factors such as site conditions, climatic conditions, standards of specification, market conditions, etc. Costs for associated site development work such as site formation, utilities, paving, parking and landscaping are excluded.<br/> Figures also exclude furniture, fittings and equipment (FF&E) with the exception of figures for Hong Kong, China and Singapore, which do include FF&E in hotel costs.&nbsp;<br/> All project soft costs such as land acquisition, design and engineering fees, entitlements, permitting and financing are excluded.&nbsp;
+
 
+
<br/> &nbsp;
+
 
+
 
*NAHB. “Cost of Constructing a Home.” Heather Taylor, National Association of Home Builders, Economics and Housing Policy Group, November 2, 2015. [https://www.nahbclassic.org/generic.aspx?genericContentID=248306 https://www.nahbclassic.org/generic.aspx?genericContentID=248306].<br/> &nbsp;  
 
*NAHB. “Cost of Constructing a Home.” Heather Taylor, National Association of Home Builders, Economics and Housing Policy Group, November 2, 2015. [https://www.nahbclassic.org/generic.aspx?genericContentID=248306 https://www.nahbclassic.org/generic.aspx?genericContentID=248306].<br/> &nbsp;  
 
*Rider Levett Bucknall Ltd. (Phoenix, Arizona, USA). "Rider's Digest 2016." [http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf].<br/> "A &nbsp;compendium of USA cost data and related information as well as international cost data.&nbsp;<br/> "Rider Levett Bucknall is an international property and construction consultancy firm with over 120 offices worldwide.&nbsp;The costs stated in this section represent hard construction costs and reflect the standards and specifications normal to that country or region. Variation in costs may be experienced for factors such as site conditions, climatic conditions, standards of specification, market conditions, etc. Costs for associated site development work such as site formation, utilities, paving, parking and landscaping are excluded.<br/> "Figures also exclude furniture, fittings and equipment (FF&E) with the exception of figures for Hong Kong, China and Singapore, which do include FF&E in hotel costs.&nbsp;<br/> "All project soft costs such as land acquisition, design and engineering fees, entitlements, permitting and financing are excluded."<br/> &nbsp;  
 
*Rider Levett Bucknall Ltd. (Phoenix, Arizona, USA). "Rider's Digest 2016." [http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf http://assets.rlb.com/production/2016/04/20002334/RLB-Riders-Digest-USA-2016.pdf].<br/> "A &nbsp;compendium of USA cost data and related information as well as international cost data.&nbsp;<br/> "Rider Levett Bucknall is an international property and construction consultancy firm with over 120 offices worldwide.&nbsp;The costs stated in this section represent hard construction costs and reflect the standards and specifications normal to that country or region. Variation in costs may be experienced for factors such as site conditions, climatic conditions, standards of specification, market conditions, etc. Costs for associated site development work such as site formation, utilities, paving, parking and landscaping are excluded.<br/> "Figures also exclude furniture, fittings and equipment (FF&E) with the exception of figures for Hong Kong, China and Singapore, which do include FF&E in hotel costs.&nbsp;<br/> "All project soft costs such as land acquisition, design and engineering fees, entitlements, permitting and financing are excluded."<br/> &nbsp;  
 
*Sveikauskas, Leo. “Productivity growth in construction.” ''Journal of Construction Engineering and Management'', Oct 2016. [http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001138 http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001138].<br/> &nbsp;  
 
*Sveikauskas, Leo. “Productivity growth in construction.” ''Journal of Construction Engineering and Management'', Oct 2016. [http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7862.0001138 http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001138].<br/> &nbsp;  
 +
*Terner Center, UC Berkeley. [http://ternercenter.berkeley.edu/construction-costs “Terner Center Study: Understanding the Drivers of Rising Construction Costs in California.]” 2017. .<br/> &nbsp;
 
*U.S. Census. "Construction: Summary Series: General Summary: Specialization in Types of Construction by Subsectors and Industries: 2012." ''2012 Economic Census of the United States.&nbsp;''Release Date&nbsp;: 10/30/2015.&nbsp;[https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table]  
 
*U.S. Census. "Construction: Summary Series: General Summary: Specialization in Types of Construction by Subsectors and Industries: 2012." ''2012 Economic Census of the United States.&nbsp;''Release Date&nbsp;: 10/30/2015.&nbsp;[https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?pid=ECN_2012_US_23SG06&prodType=table]  
  
 
&nbsp;
 
&nbsp;

Revision as of 15:20, 10 January 2018

Development costs are all those required to complete a new project such as housing

 

Land acquisition cost

 

Entitlement cost

 

Design 

 

Financing

 

Construction costs
 

Taxes and fees

 

References